INSTALLED CAPACITY & PRODUCTION
- The Installed Capacity as on 31st March 2024 was 95 K MTPA
- The Production during the year 2023-24 was 40 Lakh MT
- The Capacity Utilization was 78% during 2023-24
IMPORTS
- Imports was 145 K MT during the year.
- 100% CPVC is consumed in Pipe & Fittings