INSTALLED CAPACITY & PRODUCTION

  • The Installed Capacity as on 31st March 2025 was 95KMT
  • The Production during the year 2024-25 was 75KMT
  • The Capacity Utilization was 79% during 2024-25

IMPORTS

  • Imports were 170 K MT during the year.
100% CPVC is consumed in Pipe & Fittings